2GC INTERMEDIATE CHOKE LEVER (Fig. 47)
|
|
|
CARBURETOR ASSEMBLY (Fig. 48)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FIGURE 48 ROCHESTER 2GV CARBURETOR (Fig. 49)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FIGURE 47
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. With choke coil lever aligned with boss inside choke housing, install intermediate choke lever and retain with screw (Figure 47).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8. Install new choke housing to carburetor gasket.
|
|
|
|
|
9. Position choke housing on throttle body and retain with (2) screws. Tighten securely.
|
|
10. Install choke housing baffle plate.
|
|
|
|
|
|
11. Install choke housing cover with gasket and stat coil with end of coil below choke lever plastic tang. Adjust thermostatic coil as outlined in 9D-3 Section of the Delco Carburetor Parts and Service Manual (9X). Install (3) cover screws and retainers. Tighten evenly and securely.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
THROTTLE LEVER
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12. Install vacuum break and bracket assembly to air horn using two attaching screws. Tighten securely.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FIGURE 49
|
|
|
|
|
13. Connect hose from choke vacuum break to fitting on throttle body.
|
|
|
|
|
|
|
|
|
|
|
|
14. Position choke rod into upper choke lever and into fast idle cam (Figure 48).
|
|
|
ASSEMBLY OF 2GV WITH SINGLE VACUUM BREAK - (Figure 49)
|
15. Install upper choke lever onto choke shaft.
|
|
|
|
|
21. Install vacuum break and bracket assembly to air horn using two attaching screws. Tighten securely.
|
16. Install fast idle cam to throttle body, retaining with fast idle cam screw. Tighten securely.
|
|
|
22. Connect hose to choke vacuum break and to fitting on throttle body.
|
17. Position vacuum break rod and intermediate choke rod into vacuum break lever.
|
|
|
23. Position vacuum break rod into diaphragm plunger and in choke lever. Retain with clip where used.
|
18. Position intermediate choke rod into intermediate lever. 19. Hook vacuum break rod into vacuum break.
|
|
|
24. Install choke lever to choke shaft, aligning flats on lever with flats on shaft - tang on lever faces outward. Install attaching screw and tighten securely.
|
20. Install vacuum break lever and retaining screw. Tighten
|
|
|
|
screw securely.
|
|
|
|
|
|
|
|